Installation of the docking system for the factory of “Ilim Gofra” was finished

In February, our service engineers installed the docking system for the factory of “Ilim Gofra”, which specializes in producing of corrugated packaging. The particularity of the production process and the industry required a special solution, specifically a dock leveler with large carrying capacity (15 tons), because a standard six-ton dock leveler is unable to withstand the loads.
 
Far from all of the companies were able to supply the non-standard dock leveler with large carrying capacity, and we won the competition for supply and installation of the docking system for the factory. In the end of February all installation works were finished and in the coming days the system is going to be put into operation.